Today’s priorities
Commercial exposure
- Tier 1 orders exposed
- 13
- Projected penalties
- €125,000
- At projected delay / day
- €32,500
- Orders with date risk
- 11
Action queue
Supplier delivery drift
Mean actual minus planned lead time · open parts only
Freight mix
Recorded modes · not shipment tracking
Customer commitments
Unique active orders · projected delivery-date risk
Continuous improvement
open preventive follow-ups · 3 recorded recoveries
Operational analytics
Projected penalties by customer
Forecast only · each sales order counted once at its worst open-part delay
Supplier lead-time comparison
Mean planned versus actual days · measured open parts, not a historical trend
Workflow bottlenecks
Current stage distribution · selected analysis scope, not conversion rates
Expedite benefit scenario
Whole-board order blockers retained · penalty savings minus extra freight cost · no booking
Shortage board 14 parts
Shortages (14)
| Part Details | Line Impact | Shortage | Planner | Fix Confidence | Stage | ||
|---|---|---|---|---|---|---|---|
PN-8402-HX Brushless Servo Motor 48V Motion Control +85% demand | Line A - Robotics Build 18 Nov | €412,000 1 SO · €659,200 | 120 pcs 6d late Line stop in 18h | Sarah M. | Stalled | 2Sourcing Alternative | |
PN-3317-FP FPGA Controller Board Rev C Precision Electronics | Line B - Drive Units Build 19 Nov | €286,500 2 SO · €802,200 | 340 pcs 4d late Line stop in 30h | Marco R. | At Risk | 3Expedited / In-Transit | |
PN-5521-PL PLC CPU Module 1516-3 PN Control Systems | Line C - Control Cabinets Build 18 Nov | €174,200 1 SO · €278,700 | 45 pcs 9d late Line stop in 22h | Anika T. | Stalled | 1Shortage Detected | |
PN-1209-EN Absolute Rotary Encoder 23-bit Sensors & Feedback +46% demand | Line A - Robotics Build 19 Nov | €198,000 3 SO · €712,800 | 260 pcs 3d late Line stop in 40h | Sarah M. | At Risk | 4Customs Hold | |
PN-6603-PS 24V DIN-Rail Power Supply 20A Power +62% demand | Line C - Control Cabinets Build 19 Nov | €132,700 1 SO · €212,300 | 210 pcs 5d late Line stop in 46h | Sarah M. | Stalled | 4Customs Hold | |
PN-1876-CM Industrial CMOS Camera 12MP Precision Electronics +41% demand | Line E - Vision Systems Build 20 Nov | €148,000 1 SO · €236,800 | 60 pcs 7d late Line stop in 3d | Priya D. | Stalled | 2Sourcing Alternative | |
PN-7740-HR Shielded Cable Harness 24-pin Interconnect +34% demand | Line B - Drive Units Build 20 Nov | €96,400 2 SO · €269,900 | 800 pcs 2d late Line stop in 3d | Marco R. | High Confidence | 3Expedited / In-Transit | |
PN-5108-CP MLCC Capacitor 10µF 0805 (reel) Precision Electronics | Line B - Drive Units Build 21 Nov | €89,000 3 SO · €320,400 | 40 reels 3d late Line stop in 4d | Sarah M. | At Risk | 3Expedited / In-Transit | |
PN-9031-LS Laser Distance Sensor IP67 Sensors & Feedback | Line E - Vision Systems Build 22 Nov | €61,200 3 SO · €220,300 | 75 pcs 2d late Line stop in 5d | Priya D. | At Risk | 1Shortage Detected | |
PN-2288-BR Angular Contact Bearing 7206 Mechanical | Line D - Gearboxes Build 21 Nov | €58,300 3 SO · €209,900 | 1,500 pcs 1d late Line stop in 4d | Jonas K. | At Risk | 2Sourcing Alternative | |
PN-6650-IO EtherCAT I/O Coupler 16DI Control Systems | Line A - Robotics Build 22 Nov | €43,000 2 SO · €120,400 | 150 pcs 1d late Line stop in 5d | Marco R. | High Confidence | 5Cleared & Delivered | |
PN-4415-GX Planetary Gearhead 10:1 Motion Control | Line D - Gearboxes Build 23 Nov | €74,900 2 SO · €209,700 | 90 pcs On time Line stop in 6d | Jonas K. | High Confidence | 3Expedited / In-Transit | |
PN-3390-RL Safety Relay Module SIL3 Control Systems | Line C - Control Cabinets Build 24 Nov | €38,500 2 SO · €107,800 | 130 pcs On time Line stop in 7d | Anika T. | High Confidence | 5Cleared & Delivered | |
PN-7212-LG Linear Guide Rail 1200mm Mechanical | Line A - Robotics Build 25 Nov | €27,300 1 SO · €43,700 | 48 pcs On time Line stop in 8d | Jonas K. | High Confidence | 4Customs Hold |
Outbound shipping & customs gate
Documents each customer order needs before it can leave the dock. 0 of 27 open orders ready. Saved in this browser; no customs or carrier systems are connected.
| Sales order | Customer | Freight | Readiness | Action |
|---|---|---|---|---|
| SO-9900 | Siemens Healthineers | Not specified | Choose freight mode | |
| SO-9907 | Krones AG | Not specified | Choose freight mode | |
| SO-9908 | Festo SE | Not specified | Choose freight mode | |
| SO-9914 | Philips Medical | Not specified | Choose freight mode | |
| SO-9915 | Vestas Wind | Not specified | Choose freight mode | |
| SO-9916 | Siemens Healthineers | Not specified | Choose freight mode | |
| SO-9921 | Bosch Rexroth | Not specified | Choose freight mode | |
| SO-9928 | Festo SE | Not specified | Choose freight mode | |
| SO-9929 | Trumpf GmbH | Not specified | Choose freight mode | |
| SO-9935 | Vestas Wind | Not specified | Choose freight mode | |
| SO-9936 | Siemens Healthineers | Not specified | Choose freight mode | |
| SO-9937 | Bosch Rexroth | Not specified | Choose freight mode | |
| SO-9942 | ASML | Not specified | Choose freight mode | |
| SO-9949 | Trumpf GmbH | Not specified | Choose freight mode | |
| SO-9950 | Philips Medical | Not specified | Choose freight mode | |
| SO-9956 | Siemens Healthineers | Not specified | Choose freight mode | |
| SO-9957 | Bosch Rexroth | Not specified | Choose freight mode | |
| SO-9958 | ASML | Not specified | Choose freight mode | |
| SO-9963 | Krones AG | Not specified | Choose freight mode | |
| SO-9970 | Philips Medical | Not specified | Choose freight mode | |
| SO-9971 | Vestas Wind | Not specified | Choose freight mode | |
| SO-9977 | Bosch Rexroth | Not specified | Choose freight mode | |
| SO-9978 | ASML | Not specified | Choose freight mode | |
| SO-9979 | Krones AG | Not specified | Choose freight mode | |
| SO-9984 | Festo SE | Not specified | Choose freight mode | |
| SO-9991 | Vestas Wind | Not specified | Choose freight mode | |
| SO-9992 | Siemens Healthineers | Not specified | Choose freight mode |
Continuous improvement
Fictional demo examples included. Costs, causes, people and dates are illustrative, not company results.
- Recorded recoveries
- 3
- Open follow-ups
- 2
- Recorded actual recovery cost
- €5,700
- 3 of 3 costs supplied
Root-cause Pareto
| Cause | Count | Cumulative |
|---|---|---|
| 1 | 33% | |
| 1 | 67% | |
| 1 | 100% |
Repeat escalations · past 30 days
More than two recorded escalation starts per supplier or part. Counts include initial detection and reopening, not stage changes.
Suppliers
Parts
No repeat escalations recorded.
Recovery & preventive-action register
| Recovered / part | Cause | Actual cost | Owner / reference | Follow-up |
|---|---|---|---|---|
15/11/2026 PN-6650-IO | Carrier / customs hold | €850 | Marco R. DEMO-CAPA-412 | |
14/11/2026 PN-3390-RL | Supplier machine / tooling breakdown | €3,200 | Anika T. DEMO-8D-084 | |
30/10/2026 PN-3390-RL | Tier-2 / raw material shortage | €1,650 | Anika T. DEMO-CAPA-083 |
Enterprise connectors
How Apex fits your SAP ECC and Microsoft 365 tools. These are not connected yet in this prototype, each card shows what works today.
- SAP ECC○ Not connected · planned
System of record
Daily MD04 / ME2M / VA05 extract (scheduled job) loaded through Import.
Today: Use Import with an SAP export file.
- SharePoint○ Not connected · planned
Shared file handover
Watch a folder such as /Supply Chain/Daily Shortages and load new versions automatically.
Today: Download the file from SharePoint, then use Import.
- Outlook○ Not connected · planned
Supplier replies
Forward supplier emails from a shared mailbox to the AI update reader.
Today: Paste the email into “Read supplier update”.
- Microsoft Teams○ Not connected · planned
Standup channel
Post the morning summary to your standup channel automatically.
Today: Copy the summary below and paste it in Teams.
- Power BI○ Not connected · planned
Monthly reporting
Feed the cleaned board data into your Power BI reports.
Today: Use Export (Excel) as a Power BI data source.
Teams standup message preview
Apex standup · Tuesday 17 November Open shortages: 12 · Production value at risk: €1,758,500 · Stalled: 4 Top critical parts: • PN-8402-HX (Line A - Robotics) – 18h to line stop – Kessler Antriebstechnik GmbH • PN-5521-PL (Line C - Control Cabinets) – 22h to line stop – Vectra Automation SpA • PN-3317-FP (Line B - Drive Units) – 30h to line stop – Nordwave Electronics AB
Built from the current board. Nothing is sent automatically.